GDSUTP – BRT (Airport – Gazipur) - at a Glance

 

Name of the project  : Greater Dhaka Sustainable Urban Transport Project (BRT Gazipur-Airport)
Division : Road Transport and Highways Division
Ministry : Ministry of Road Transport and Bridges
Implementing Agencies : Roads and Highways Department (RHD)
    Bangladesh Bridge Authority (BBA)
    Local Government Engineering Department (LGED)
Duration : December 2012- December 2018
Proposed : December 2012- June 2020
Project Cost : BDT 20,398.5 million
  : GOB             : BDT   4,345.8 million
  : Project Aid   :  BDT 16,507.0 million
Project Financiers
:
Government of The People's Republic of Bangladesh (GOB)
    Asian Development Bank (ADB)
    French Development Agency (AFD)
    Global Environmental Facility (GEF)
Length
:
20.50 kilometers
    At Grade      : 16.00 kilometers
    Elevated       :  4.50 kilometers
Stations
:
25 nos.
Bus Depot
:
01 nos. (Gazipur)
Terminal
:
02 nos. (Airport and Shibbari)
Flyovers
:
06 nos. (Airport, Jasimuddin, Kunia, Open University, Vogra & Joydevpur Chowrasta) 
Bridge
:
01 no (upgrading Tongi Bridge to 10 lane)
Kitchen Market
:
08 nos
Access Road
:
113 nos (56 Kilometers)
High Capacity Drain
:
24.00 Kilometer on both sides
Footpath
:
20.50 kilometers on both sides
Travel Time
:
50 minutes (Gazipur to Airport)
Frequency of Buses
:
2 to 5 minutes